Results of the radius factor stability assessment method for design and pillar extraction at the Conqueror Mine, St Ives Gold Mine
Andrews, P; Barsanti, B; (2008). Results of the Radius Factor stability assessment for design and pillar extraction at the Conqueror Mine, St Ives Gold Mine, Proceedings of the First Southern Hemisphere International Rock Mechanics Symposium. Perth, Australia.
DownloadNew stability assessment methods at Conqueror Mine, St Ives Gold Mine
Barsanti, B; Andrews, P; (2006). New Stability Assessment Methods at Conqueror Mine, St Ives Gold Mine, Seventh Australia – New Zealand Young Geotechnical Professionals Conference. Adelaide, Australia.
Defining the role of elastic modelling in underground mine design
Barsanti, B; Basson, F; (2015). Defining the role of elastic modelling in underground mine design, Proceedings of the International Seminar on Design Methods in Underground Mining. Perth, Australia.
DownloadSimulate waste rock flow during co-disposal for dilution control
Basson, F; Dalton, N; Barsanti, B; Flemmer, A; (2015). Simulate waste rock flow during co-disposal for dilution control, Proceedings of the International Seminar on Design Methods in Underground Mining. Perth, Australia.
DownloadHarvesting tailings from an active tailings storage facility: success and challenges – Frog’s Leg Mine
Gopalakrishnan, V; Nester, T; Mgumbwa, J, Holtzhausen, W; (2018). Harvesting tailings from an active tailings storage facility; success and challenges – Frog’s Leg Mine, Proceedings of the Twenty First International Seminar on Paste and Thickened Tailings, Australian Centre for Geomechanics. Perth, Australia.
DownloadTowards the implementation of discrete fracture network modelling as a geotechnical design tool – Case Study of Callie Underground Mine
Graaf, J; Barsanti, B; Doumis, K; Rogers, S; (2014). Towards the implementation of discrete fracture network modelling as a geotechnical design tool – Case study of Callie Underground Mine, AusRock: Third Australiasian Ground Control in Mining Conference. Sydney, Australia.
DownloadDesign and management processes involved with extracting regional pillar stopes in a seismic setting at Darlot Gold Mine
Moulding, C; Andrews, P; (2015). Design and management processes involved with extracting regional pillar stopes in a seismic setting at Darlot Gold Mine, Proceedings of the International Seminar on Design Methods in Underground Mining. Perth, Australia.
DownloadManaging the onset of accelerated deformation in capital development at Agnew Gold Mine
Moulding, C; Stephenson, R; Barsanti, B; Francis, D; (2017). Managing the onset of accelerated deformation in capital development at Agnew Gold Mine, Eighth International Conference on Deep and High Stress Mining, Australian Centre for Geomechanics. Perth, Australia.
DownloadManaging a change in rock mass response to mining at the Frog’s Leg underground mine
Mgumbwa, J; Page, A; Human, L; Dunn, M; (2017). Managing a change in rock mass response to mining at the Frog’s Leg underground mine, Eighth International Conference on Deep and High Stress Mining, Australian Centre for Geomechanics. Perth, Australia.
DownloadPaste improvement at La Mancha’s Frog’s Leg underground mine
Mgumbwa, J; Nester, T; (2014). Paste improvement at La Mancha’s Frog’s Leg Underground Mine, Eleventh international symposium on Mining with backfill. Perth, Australia.
DownloadMining of orebodies under shear loading – Part 1: Case histories
Suorineni, F; Kaiser, P; Mgumbwa J; Thibodeau, D; (2011). Mining of orebodies under shear loading – Part 1: Case histories, Mining Technology, Vol. 120 (3), pp. 137-147.
DownloadMining of orebodies under shear loading – Part 2: Failure modes and mechanisms
Suorineni, F; Mgumbwa, J; Kaiser, P; Thibodeau, D; (2014). Mining of orebodies under shear loading – Part 2: Failure modes and mechanisms, Mining Technology, Vol. 123 (4), pp. 240-249.
DownloadStability of Pillars and Tabular Excavations under Shear LoadingConditions–Implications for Mine Planning and Design
Suorineni, F; Mgumbwa, J; Kaiser, P; Mfanga, D; (2011). Stability of pillars and tabular excavations under shear loading conditions, CIM Conference. Montreal, Canada.
DownloadFailure Mechanisms of Pillars Under Shear Loading
Mgumbwa, J; Suorineni, F; Kaiser, P; (2010). Failure mechanisms of pillars under shear loading. Maintenance Engineering/ Mine Operators’ Conference (MEMO 2010). Sudbury, Canada.
DownloadA methodology for managing squeezing ground conditions at Mincor’s Mariners Mine, Western Australia
Nester, T; du Plooy, D; (2010). A methodology for managing squeezing ground conditions at Mincor’s Mariners Mine, Western Australia, 5th International Seminar on Deep and High Stress Mining. Santiago, Chile.
Development of the MDX Bolt and in situ dynamic testing at Telfer Gold Mine
Darlington, B., Rataj, M., Balog, G., Barnett, D. (2018). Development of the MDX Bolt and in situ dynamic testing at Telfer Gold Mine. Third International Conference on Rock Dynamics and Applications (RocDyn-3), Trondheim, Norway.
DownloadA case study: managing decline deformation in an active sublevel caving operation
Woods, M.J., Fitch, S., Doolan, J. and Barnett, D.S. (2019). A case study: managing decline deformation in an active sublevel caving operation, First International Conference on Mining Geomechanical Risk, Australian Centre for Geomechanics, Perth.
Download